LYSAGHT® BONDEK® II the best-of-bred solution from Australian expert – as a viable alternative to traditional formwork and bottom reinforcement steel mesh for concrete slab system. It is widely applied for industrial, multi-floor, commercial, civil and public buildings worldwide… with proven efficiency
Nominal cover width: 600mm |
Rib height: 51mm |
ADVANTAGES: |
1. OPTIMAL SOLUTION FOR QUALITY, TIME, COST & AESTHETIC |
- Save cost up to 15% and accelerate the construction progress by approx. 20% with superior spanning feature, stronger floor slabs for minimum deflection - Being more safety in construction, reduce the risks of scaffolding issues - Smart profile support for M&E hanging system - Aesthetic and durable finished surface with high quality steel integrated AM – Activate™ technology |
2. TRUSTED QUALITY FOR DURABILITY |
Experiment test meets Australian standard - Structural test (Excellent spanning capacity during the formwork stage) - Slip block test (Well bonding between LYSAGHT® BONDEK® II and concrete slab as a composite system). - British Standard 476 and TCVN 9311-5:2012 Fire Tests (Fire resistance test compliance with standards BS 476 and TCVN 9311-5:2012) Designed with specialized software in accordance with Australian and European Standards (AS3610; AS 1397; BS 5950) and Singaporean standards (EN 1992; EN 1994) |
3. WORLD-CLASS TECHNICAL SERVICE STANDARD |
- Technical support for design and optimization - On-site installation technical consultant - Proven case study and real experience by learning trip |
Video
Landmark 81 is fast becoming the icon of Ho Chi Minh City, being the tallest building in Vietnam with 81 stories at 461.5 meters tall.